Assembly and Erection
This chapter is intended to provide recommendations on transporting, handling, assembling, and erecting fiber-reinforced polymer (FRP) poles. An important consideration is that FRP poles...

Evaluation of the Geo-Con Vert Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center This report describes a HITEC evaluation designed...

Structure as Art
The structural engineering to support the architecture of a free-form, Frank Gehry-designed building is never easy, but the engineers for a new university building devised several innovative...

Evaluation of the Inter-Lok Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Breakwaters '99
First International Symposium on Monitoring of Breakwaters
The papers present state-of-art methods and technologies that are used in the structural and environmental monitoring of rubble mound breakwaters. Structural monitoring concerns the structural...

Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...

Recent Advances in Optimal Structural Design
Sponsored by the Technical Committee on Structural Design of the Technical Administrative Committee on Analysis and Computation of the Technical Activities Division of the Structural Engineering...

Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

A Dam for a Dam
The General Electric (GE) Dam in Minneapolis, Minnesota, was more than a century old when it began leaking excessively in December 1998. Operations staff for the dam owner�the Minneapolis-based...

Preserving Pisa's Treasure
Pisa's bell tower, a prime example of Romanesque architecture, would be renowned even if it did not lean. Construction of the tower began in 1173 and was not completed until...

Metamorphosis
Ranked as one of the 15 tallest buildings in New York, the headquarters of the Bear Stearns Companies, Inc., is a 45-story skyscraper that is 815 ft (248 m) tall. Replacing an existing...

Countering Chemical and Biological Terrorism
Prior to the terrorist attacks of September 11, building protection related to terrorism primarily focused on the threat of bombs detonated inside vechicles. However the September 2001...

The Chernobyl Problem
When the infamous accident at the Chernobyl Nuclear Power Plant occurred in April 1986�a catastrophe that involved an explosion that blew off the top of one of the plant's...

Dissecting the Collapses
The September 11 terrorist attacks on the World Trade Center horrified the civilized world. An estimated 2,830 human lives were extinguished by these attacks. In the aftermath of the events,...

Physical Model of Current-Induced Scour at Ventura Harbor
This paper describes a 1:25-scale movable-bed physical model study of scour resulting from longshore current passing through a narrow gap on the leeside of the detached breakwater at Ventura...

Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....

Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...

In Situ Behavior of Breakwaters in Constantza Port?Romania
In order to build breakwaters, especially in the areas with heavy storms, a special analysis on the several factors is necessary. In addition, surveillance of time behavior of breakwaters...

Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...

Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...

 

 

 

 

Return to search